J-PARC中微子光束线和1.3 MW升级

J-PARC Neutrino Beamline and 1.3 MW Upgrade

论文作者

Oyama, Yuichi

论文摘要

J-PARC中微子束线自2009年以来一直在运行。直到2018年5月,达到的最大光束功率为约500 kW。将来,梁功率将升级到1.3兆瓦。在2020年代末进行稳定运行之后,我们每年可以累积约30 x 10^20的锅数据。它的数字几乎与最近10年中累积的总锅相同。据报道,主环以及中微子梁线的升级计划。

J-PARC neutrino beamline has been operated since 2009. Until May 2018, the maximum beam power achieved was ~500 kW. In future, the beam power will be upgraded to 1.3 MW. After the stable operation in late 2020s, we can accumulate ~30 x 10^20 POT data per year. It is almost the same number as total POT accumulated in recent 10 years. The upgrade plan of the Main Ring as well as the neutrino beamline is reported.